Pictures 2019

Sub-site 5 coherence priority Landau - Measure C.1 - C.5: From left to right: Mr. Dr. Steininger, First Mayor of Landau; Mr. Sadgorski, Head of the WWA Landshut; Mr. Haselbeck, District President of the Government of Lower Bavaria; Mr. Dr. Barth, Head of the StMUV Office; Mr. Trapp, District Administrator Dingolfing-Landau; Mrs. Dr. Loibl, Member of the Bavarian Parliament. Bild vergrössern Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: From left to right: Mr. Dr. Steininger, First Mayor of Landau; Mr. Sadgorski, Head of the WWA Landshut; Mr. Haselbeck, District President of the Government of Lower Bavaria; Mr. Dr. Barth, Head of the StMUV Office; Mr. Trapp, District Administrator Dingolfing-Landau; Mrs. Dr. Loibl, Member of the Bavarian Parliament


Sub-site 5 'coherence priority Landau' - Measure C.1 - C.5: First gravel masses are poured upstream to an island. Bild vergrössern
Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: First gravel masses are poured upstream to an island.


Sub-site 5 'coherence priority Landau' - Measure C.1 - C.5: Finished gravel island near Zulling. Bild vergrössern
Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: Finished gravel island near Zulling.


Sub-site 7 'FFH priority Ettling' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in May 2019 Bild vergrössern
Sub-site 7 'FFH priority Ettling' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in May 2019


Sub-site 7 'FFH priority Ettling' - Measure C.10: Creation of a temporary small water body as a habitat for amphibians Bild vergrössern
Sub-site 7 'FFH priority Ettling' - Measure C.10: Creation of a temporary small water body as a habitat for amphibians


Sub-site 1 'FFH priority Loiching' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in July 2019 Bild vergrössern
Sub-site 1 'FFH priority Loiching' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in July 2019

Sub-site 1 FFH priority Loiching - Measures C.1 - C.5: Condition of the Isar river prior to the beginning of construction work Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Condition of the Isar river prior to the beginning of construction work
Sub-site 1 FFH priority Loiching - Measures C.1 - C.5: Impressions from the construction site Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Impressions from the construction site
Sub-site 1 FFH priority Loiching - Measures C.1 - C.5: Progress of construction works in January 2019 Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019
Sub-site 1 FFH priority Loiching - Measures C.1 - C.5: Progress of construction works in January 2019 Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019

Sub-site 1 FFH priority Loiching - Measures C.1 - C.5: The Isar river becomes accessible and experienceable again. Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measure C.1 - C.5: The Isar river becomes accessible and experienceable again.

Sub-site 1 FFH priority Loiching - Measures C.1 - C.5: Covered sleeping protection. Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Covered sleeping protection.

Sub-site 1 FFH priority Loiching - Measures C.10: Creation of a temporary small water body as habitat for amphibians. . Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.10: Creation of a temporary small water body as habitat for amphibians..

Sub-site 1 FFH priority Loiching - Measures C.19: Installation of small structures; here stacks of dead wood. Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.19: Installation of small structures; here stacks of dead wood.

Sub-site 1 FFH priority Loiching - Measures C.6: Ecological upgrading of a  rubble drain after completion. Bild vergrössern Sub-site 1 "FFH priority Loiching" - Measures C.6: Ecological upgrading of a rubble drain after completion.

Sub-site 7 ´FFH priority Ettling´ - Measure C.9: New construction and optimisation of an existing floodplain Bild vergrössern Sub-site 7 "FFH priority Ettling" - Measure C.9: New construction and optimisation of an existing floodplain.

Sub-site 6 ´FFH priority Landau´ - Measure C.12: Freshly mulched larger area with preserved umbrella trees shortly before afforestation. Bild vergrössern Sub-site 6 "FFH priority Landau" - Measure C.12: Freshly mulched larger area with preserved umbrella trees shortly before afforestation.

Sub-site 6 ´FFH priority Landau´ - Measure C.12: Problem of clematis, this extremely vigorous plant ´steals´ the light from all other plants and trees. Bild vergrössern Sub-site 6 "FFH priority Landau" - Measure C.12: Problem of clematis, this extremely vigorous plant "steals" the light from all other plants and trees.

Sub-site 6 ´FFH priority Landau´ - Measure C.12: Area of mulched land after afforestation. Since the area was fenced, individual tree protection can be dispensed with here. The individual trees are marked with a Tonkin Cane. This facilitates the maintenance. Bild vergrössern Sub-site 6 "FFH priority "Landau - Measure C.12: Area of mulched land after afforestation. Since the area was fenced, individual tree protection can be dispensed with here. The individual trees are marked with a Tonkin Cane. This facilitates the maintenance.